Walk the site.
Ship the report.
Tap the floorplan where the defect is. Shoot it. Tag it. Keep walking.
Tap the floorplan where the defect is. Shoot it. Tag it. Keep walking.
A branded PDF with your cover, a numbered pin map and one entry per defect. Split it by trade so the tiler gets only the tiler's pages.
Plans, photos, pins and the PDF are all made on this phone. Punchlist has no internet permission at all, so nothing can leave it.
No projects yet.
Start with the sample plan to see how a walk works, or set up your own project and import a floorplan photo.
Everything here lives on this phone only. Take a backup from Setup before you change devices.
No plan on this project yet.
Photograph the paper plan on the wall, or pick an image of it from this phone. You can square up the corners afterwards.
The plan image is missing.
Its pins are safe, but the picture is not on this phone. Restore the backup it came from, or remove the plan from the project and add it again.
Pick a project first.
Open a project from the Projects tab and its plan appears here.
Walk mode on. Tap the plan where the defect is.
Typed by you, not fetched. Weather gets argued about in payment disputes, so it belongs on the cover.
Group entries by
Include
Trade filter
Nothing generated on this project yet.
Open a project to build its report.
Reports are assembled from the defects on the project's plans.
Branding, trades and your data
This is the cover of every report you send. It is the whole reason a client thinks you are a bigger outfit than you are.
Assign a defect to a person, then send that person only their own pages.
No contacts yet. Add the trades you work with and a defect can be issued to a person.
A tap you can feel through a glove when a pin is set.
The screen stays lit in walk mode so the plan does not lock in your hand.
Punchlist has no account and no server. A backup is a file you hold. Photos are included, so a backup of a busy project is large.
Punchlist. No account, no ads, no internet permission.
Published by SocialSure Private Limited.
Defect
Camera is off.
Note
Trade
Severity
Room or zone
Due
Assign to
Defect
New project
A project needs a name before it can be saved.
One plan per floor or zone. Import a photo of the paper plan or an image exported from a PDF, then square up the corners.
Square up the plan
Drag the four corners onto the corners of the drawing. Punchlist straightens the perspective out of the photo.
Contact
Give the contact a name or a company.
Report
A separate PDF with only that trade's defects, numbered as they are on the full report.
Plans
Working